Solar Glossary
Solar Terms, in Plain English
The words you will meet when planning a solar plant, from CAPEX and I&C to kWp and net metering.
A
- Accelerated depreciation
- A tax benefit that lets a business that owns a solar plant write off its cost faster than normal assets, reducing taxable income in the early years. Available under the CAPEX model.
- ACDB / DCDB
- AC and DC distribution boards: the enclosures that house the fuses, isolators and surge protection between the modules, the inverters and the grid connection.
- ALMM
- Approved List of Models and Manufacturers: the list of solar modules approved by India's Ministry of New and Renewable Energy (MNRE) for use in government-linked projects.
- ALMM List-II
- MNRE's approved list of solar PV cell manufacturers. From 1 June 2026, projects covered by the ALMM order must use List-I modules made with List-II cells.
B
- Balance of system (BOS)
- Everything in a solar plant except the modules: mounting structures, inverters, cables, distribution boards, earthing, lightning protection and monitoring.
- Bifacial module
- A solar module that generates power from both sides, using light reflected from the ground onto its rear face.
C
- CAPEX model
- The owner pays for the solar plant upfront and owns it outright, keeping all the savings. Arrays Ingenieria builds plants on this model.
- Commissioning
- The final stage of a project: testing every component, synchronising the plant with the grid and handing it over as ready to generate.
- CUF (capacity utilisation factor)
- The energy a plant actually generates in a year as a percentage of what it would generate running at full capacity all year.
D
- DCR (domestic content requirement)
- A rule in some government schemes that modules and cells must be made in India.
- DG synchronisation
- Controls that let a solar plant run alongside diesel generators safely, reducing fuel use without back-feeding the generators.
E
- Earthing
- Connecting the plant's metal structures and electrical equipment to the ground so that fault currents and lightning are carried safely away.
- EPC
- Engineering, procurement and construction: a single contract covering the design, equipment purchase and building of the whole plant.
- Ex-servicemen-led MSME
- A micro, small or medium enterprise run by former members of the armed forces. Arrays Ingenieria is one, founded by Lt. Gen. A.R. Prasad (Retd).
F
- Financial closure
- The point at which a project's funding (equity and loans) is fully tied up, so construction can start. PM-KUSUM Component A and C projects must reach it by 30 November 2026.
G
- Grid-connected (on-grid) system
- A solar plant connected to the utility grid, which can draw from or export to the grid; the most common type for businesses.
- Ground-mount solar
- Modules installed on structures fixed to the ground, typically on pile foundations; used for tea estates, industrial land and utility parks.
- Group captive
- An arrangement where consumers take an ownership stake in an off-site solar plant and draw its power under captive-generation rules.
I
- I&C (installation & commissioning)
- The on-site work of building a solar plant to an agreed design and bringing it into operation: structures, modules, cabling, inverters, earthing, testing and commissioning.
- Inverter
- The equipment that converts the direct current (DC) from the modules into alternating current (AC) for use on site or export to the grid.
K
- kWp / MWp
- Kilowatt-peak and megawatt-peak: the rated DC output of a solar plant under standard test conditions. 1 MWp = 1,000 kWp.
L
- Lightning arrestor
- A device that intercepts lightning strikes and conducts them safely to earth, protecting modules and equipment.
M
- MMS (module mounting structure)
- The steel or aluminium frame that holds the modules at the designed tilt and orientation.
- Module cleaning system
- A pipe network with taps or nozzles across the plant so that modules can be washed regularly, recovering output lost to dust (soiling).
N
- Net metering
- A billing arrangement where the power a solar plant exports to the grid is offset against the power drawn from it.
O
- OPEX / RESCO model
- A developer (a renewable energy service company) finances and owns the plant, and the site owner buys its power at an agreed tariff. Arrays Ingenieria works as I&C or EPC partner to such developers.
P
- Panchamrit
- The five climate commitments India announced at COP26 in 2021, including 500 GW of non-fossil capacity by 2030 and net zero by 2070.
- Performance ratio (PR)
- Actual energy generated divided by the theoretical energy available from the sunlight; a measure of how well a plant is built and maintained.
- Pile foundation
- A steel or concrete pile driven or cast into the ground to anchor the module mounting structures of a ground-mount plant.
- PM Surya Ghar: Muft Bijli Yojana
- The central government scheme that subsidises rooftop solar for homes.
- Puja (commissioning ceremony)
- A traditional prayer held at a new plant, as at the inverters of the Borpatra Tea Estate solar plant at its inauguration in September 2026.
R
- Rooftop solar
- Modules installed on a building's RCC or metal-sheet roof, turning unused roof space into a power source.
S
- SCADA / remote monitoring
- Systems that record a plant's generation and faults in real time and make them visible remotely.
T
- Tier-1 module
- A module from a large, bankable manufacturer with an established production and financing track record.
- TOPCon
- Tunnel oxide passivated contact: a high-efficiency solar cell technology now common in new modules.